Ruspetro Ltd - Infrastructure

Infrastructure

All major development areas of our field are accessible by year-round, heavy-lift roads and we have an in-field pipeline network that connects pads in the western part of our field with the central processing facility.

Ruspetro’s crude oil facilities include an oil processing unit located on the VI Block with a processing capacity up to 7,500 bopd, as well as multiple oil gathering, transportation and power lines within our licence area. The oil processing unit removes both water and associated gas from the crude oil so that the crude meets the water-cut and solids requirements for inclusion in the Transneft pipeline.

Map